What changes for visitors and residents on Gran Canaria?
Asemtra, the association of freight haulage firms, has announced an indefinite haulage stoppage at the port of Las Palmas from 30 November 2026. Until then, nothing changes for residents or visitors.
The call covers the container terminals in the Puerto de Las Palmas on Gran Canaria, which many people know as Puerto de La Luz. Tenerife does not appear in the announcement, and our research found no further strike date for Santa Cruz port.
If the lorries stand still, nobody collects containers from the port. Goods for shops and supermarkets on Gran Canaria could arrive later, but there is no figure or forecast for that.
Neither Asemtra nor the port authority says anything about travellers, and the reports mention no flights, ferries or prices. Anyone expecting furniture or online orders on Gran Canaria around 30 November should ask the seller for a delivery date.
Why are the haulage firms threatening a stoppage?
Asemtra complains of long waits for loading and unloading at the container terminals in the Puerto de Las Palmas. It blames missing machinery and a shortage of staff at the terminals.
According to Asemtra, the delays cost the firms money and put road safety at risk. Drivers can also barely keep to the legal limits on driving and rest times.
The dispute is not new, as Asemtra announced a week-long stoppage at the same port in July 2025. The terminals OPCSA and Boluda were where drivers waited for hours.
OPCSA put the average wait at 20 minutes. It said it was ready to talk.
On the current call, neither Asemtra nor the terminals have issued a statement of their own. The accusations therefore come only from the association.
What is the port authority offering?
Beatriz Calzada, president of the Autoridad Portuaria de Las Palmas (the port authority), met the terminals on Monday 23 November. She may sit down with the haulage firms on Wednesday 25 November.
The main fix is a new automated system for receiving and releasing containers. The authority hired the firm Prodevelop in 2022 because growing heavy traffic was clogging the access roads for container collection.
According to Calzada, the system has been improved over the years but has so far run only in tests. The authority had already told the haulage firms in the earlier dispute that the software could end the queues.
Calzada spoke of a couple of solutions but described only the system in any detail. Nobody has published the costs, a start date or who has to operate it.
Calzada sounds confident: “I hope and trust that this will be resolved before the end of this week.” That would be before the announced strike start on 30 November.
Is this linked to the general strike of 11 November?
The general strike of 11 November 2026 ran from 00:00 to 23:59. The unions CCOO, UGT and CGT and the Sindicato de Inquilinas (a tenants’ union) called it, whereas the current call comes from a business association.
According to the employers’ group FET Canarias, container terminals in ports under Puertos del Estado (the national ports body) refused on 11 November to accept or release goods. The Transport Ministry set no minimum services (mandatory cover during a strike) for road haulage, which the association Fenadismer criticised as a lack of consideration.
Whether minimum services apply to Asemtra’s call is not known. On 11 November the ministry set one service per direction for selected freight routes, including Cádiz–Tenerife and Huelva–Tenerife.
On 16 December 2024 the association FET organised a go-slow of around 1,000 lorries, 400 each on Gran Canaria and Tenerife. It demanded the return of the 67% diesel bonus, about 15 cents a litre.
What is still open, and what happens next?
Nobody has said whether Asemtra has formally registered the strike, or with which authority. The number of firms and lorries involved has not been given either.
The meeting between Calzada and the haulage firms could take place on Wednesday 25 November. It is not confirmed.
The port authority hopes for a deal before the weekend, and if none comes the stoppage begins on Monday 30 November. In the reports available, Asemtra has not published any details of how it would run.