What does the lawsuit mean for visitors to Tenerife?
On the information available, the lawsuit has no direct effect on people in the Canaries. Electricity prices, rules and deadlines do not change.
None of the five Repsol plants in the lawsuit is on the archipelago: A Coruña, Bilbao, Cartagena, Tarragona and Puertollano. Repsol has no refinery in the Canaries either.
Anyone on holiday in the south of Tenerife does not need to rebook or apply for anything. Residents face no deadline and no form either.
Why did the Canaries stay connected on 28 April 2025?
The Canaries kept their power on the day of the blackout, according to the research available, because each island has its own grid. Only Lanzarote, Fuerteventura and La Graciosa are linked to each other.
Mobile and phone services were still disrupted, because the operators are based on the mainland. Tenerife Norte airport also had problems.
Red Eléctrica also runs the transmission grid in the Canaries. According to the research, that was not decisive for the mainland outage.
Canarian media count seven total blackouts on the islands since 2009, including Tenerife in July 2020 (around 950,000 people, seven hours). Renewables reportedly meet 15.6% of demand; pumped storage at Chira-Soria on Gran Canaria (200 MW) and Gorona del Viento on El Hierro should steady the grid.
What does Repsol accuse the power companies of?
Repsol is demanding around 120 million euros for damage across all its industrial complexes. An earlier incident at the Cartagena refinery comes on top.
Each distributor is sued over the plant it supplies: Naturgy-Fenosa in A Coruña, Iberdrola in Bilbao and Cartagena, Endesa in Tarragona and Puertollano. Red Eléctrica is also on the list in all five cases, though reports describe its role differently, as joint or secondary liability.
In April 2026, Repsol sent formal advance letters (burofaxes) to Red Eléctrica and the distributors. The lawsuits followed in October, according to the reports, after an out-of-court settlement attempt failed.
Group chief Josu Jon Imaz said in April: “We are fully determined to demand legal responsibility.” He trusts Spanish justice, and the reports do not mention any reply from the companies sued.
Who is to blame for the blackout?
The Energy Ministry's investigation panel named inadequate dynamic voltage control and overvoltage as causes in June 2025. It said Red Eléctrica had planned voltage control poorly and some generators had improperly disconnected plants from the grid.
Iberdrola, Endesa and Naturgy told Congress that Redeia, Red Eléctrica's parent company, alone bore responsibility. The Aelec association accused Red Eléctrica of negligent management.
In April 2026 the regulator CNMC opened around 20 sanction proceedings against Red Eléctrica, Iberdrola, Endesa, Naturgy and Repsol. It said the files assign no blame and that the blackout had several causes.
Judge José Luis Calama of the Audiencia Nacional (Spain's national court) closed the criminal case in January 2026 because he found no sign of sabotage or a cyberattack. He saw the dispute as a civil or administrative matter, and sources differ on whether the closure is final.
How big is the damage, and what happens next?
Repsol earlier put its recoverable damage at around 105 million euros, according to Imaz, and previously announced 125 million. Moeve, formerly Cepsa, cited around 50 million euros for itself and pointed to its Huelva and Algeciras refineries.
According to the reports, such a case can take 3 to 6 years to reach a final ruling. It takes longer if it goes to appeal before the Audiencia Provincial (provincial court) or the Tribunal Supremo (Supreme Court).
Imaz likes to recall two short power cuts at the Petronor refinery in Bilbao, for which the Tribunal Supremo awarded the company 18 million euros in compensation. Lawyers disagree on whether force majeure applies in the current case.